VEXPLOR
HOW WE QUOTE

Instead of a list price,we publish how quotes are built.

Every plant has different equipment, data and scope, so a single fixed price list can never give you an accurate answer. Instead, we show you first how a quote is calculated, where the cost goes, and how long real projects actually took.

TRANSPARENT FORMULA · REAL PROJECT DURATIONS · GOV-FUNDED PATHS
01WHAT YOU PAY FOR3 COST BLOCKS
BLOCK-1

Platform usage fee

Your VEXPLOR Suite usage fee, based on the modules and solutions you need and the scale you run them at. You use the software for the contract term in return for the usage fee. You can export your data at any time, even after the contract ends.

UNITMODULE · SOLUTION MIX × SCALE · CONTRACT TERM
BLOCK-2

Build services

The three-phase project cost: diagnosis, build and settling in. It varies with your equipment, data and integration scope.

PATHDIAGNOSIS → IMPLEMENTATION → OPERATION · STANDARD ASSET HANDOVER
BLOCK-3

Post-handover operation

Defect repair, operational maintenance and additional development are contracted separately. Small improvements within an agreed limit need no separate quote; the scope is set at contract time.

SCOPEDEFECT REPAIR · MAINTENANCE · ADDITIONAL DEVELOPMENT
02THE FORMULA3-AXIS ESTIMATION

This is how a
quote is calculated.

AXIS-1

Data scale and integration scope

Number of machines, number of existing systems (ERP · MES), and collection points.

INPUTMACHINE COUNT · EXISTING SYSTEMS (ERP · MES) COUNT · COLLECTION POINTS
AXIS-2

Scope of AI use-case design

The number of AI use cases to be applied.

INPUTNUMBER OF AI USE CASES — PREDICTIVE MAINTENANCE · ANOMALY DETECTION · QUALITY PREDICTION · REPORTING
AXIS-3

Build and integration depth

Screen and workflow configuration, and the level of on-site integration such as PLC and IoT.

INPUTSCREEN · WORKFLOW CONFIG · PLC · IOT ON-SITE INTEGRATION LEVEL
SUBMIT → DIAGNOSE [ ON-SITE OR REMOTE ] → 3-AXIS SCOPING [ DATA · USE CASES · DEPTH ] → ESTIMATE [ WITH CALCULATION BASIS ] → GOV-FUNDED PATHS REVIEWED IN PARALLELFIG — ESTIMATION PATH · A PUBLISHED FORMULA INSTEAD OF A LIST PRICE — BECAUSE EVERY PLANT DIFFERS IN EQUIPMENT · DATA · SCOPE

In the diagnosis we confirm all three axes together and give you a quote with its calculation basis. Usage-fee and build quotes follow the same principle — scope first, price after.

03REAL DURATIONSFROM ACTUAL PROJECTS

Real project
durations.

ScopeActual durationReference projects
DX smart factory build6–15 months — depending on scopea precision machinery parts manufacturer 6 months · an injection parts manufacturer 9 months · a parts manufacturer upgrade about 12 months · a metal casting manufacturer 15 months
Manufacturing-AI specialized projectAbout 9 monthsa semiconductor parts manufacturer 2026.07–2027.03 · agreement term · in progress
AI Autonomous Factory project24 months2025.06–2027.06 · agreement term · in progress
Your own timeline is presented in the diagnosis once scope is fixed — the Manufacturing-AI and Autonomous Factory figures are government program agreement terms.
04GOV-FUNDED PATHS8 PROGRAM TYPES EXPERIENCED

You can start with
government funding.

We have delivered under eight types of the national Smart Factory program — AI Autonomous Factory · Manufacturing-AI specialized · large-SME win-win (Samsung Electronics) · government standard · expert · inter-ministry · local-government · Smart AS. We design the lowest-out-of-pocket path to start with, together, during the diagnosis.

GOV-1Autonomous Factory build program (MSS · in delivery)GOV-2Manufacturing-AI specialized (6 projects)GOV-3Large-SME win-win — Samsung ElectronicsGOV-4Government standardGOV-5ExpertGOV-6Inter-ministry — food GMPGOV-7Local governmentGOV-8Smart AS

The exact quote comes from the diagnosis.

Once we confirm the three axes together, we give you a quote with its calculation basis.

FAQ Request a Diagnosis