Nothing hidden.We publish how we price.

Every plant has different equipment, data and scope, so a single fixed price list can never give you an accurate answer. Instead, we show you first how a quote is calculated, where the cost goes, and how long real projects actually took.

TRANSPARENT FORMULA · REAL PROJECT DURATIONS · GOV-FUNDED PATHS
01WHAT YOU PAY FOR3 COST BLOCKS
BLOCK-1

Platform subscription

Your VEXPLOR Suite license. Priced by the modules and solutions you need and the scale you run them at. A SaaS-based MES/FEMS for smaller plants is in field validation (NKID, phase 2).

UNITMODULE · SOLUTION MIX × SCALE · SAAS MES/FEMS IN VALIDATION (ENKID PHASE 2)
BLOCK-2

Build services

The three-phase project cost: Consulting (diagnosis) to Implementation (build) to Operation (settling in).

PATHCONSULTING → IMPLEMENTATION → OPERATION · STANDARD ASSET HANDOVER
BLOCK-3

Consulting

Dark Factory consulting. One to three engineers assigned; discounted when combined with training and one-on-one facilitation.

UNIT1–3 ENGINEERS × DURATION · TRAINING · 1:1 FACILITATION BUNDLE DISCOUNT
02THE FORMULA3-AXIS ESTIMATION

This is how a
quote is calculated.

AXIS-1

Data scale and integration scope

Number of machines, number of existing systems (ERP · MES), and collection points.

INPUTMACHINE COUNT · EXISTING SYSTEMS (ERP · MES) COUNT · COLLECTION POINTS
AXIS-2

Scope of AI use-case design

The number of AI use cases to be applied.

INPUTNUMBER OF AI USE CASES — PREDICTIVE MAINTENANCE · ANOMALY DETECTION · QUALITY PREDICTION · REPORTING
AXIS-3

Build and integration depth

Screen and workflow configuration, and the level of on-site integration such as PLC and IoT.

INPUTSCREEN · WORKFLOW CONFIG · PLC · IOT ON-SITE INTEGRATION LEVEL
SUBMIT DIAGNOSE [ ON-SITE OR REMOTE ] 3-AXIS SCOPING [ DATA · USE CASES · DEPTH ] ESTIMATE [ WITH CALCULATION BASIS ] GOV-FUNDED PATHS REVIEWED IN PARALLELFIG — ESTIMATION PATH · A PUBLISHED FORMULA INSTEAD OF A LIST PRICE — BECAUSE EVERY PLANT DIFFERS IN EQUIPMENT · DATA · SCOPE

In the diagnosis we confirm all three axes together and give you a quote with its calculation basis. Subscription and build quotes follow the same principle — scope first, price after.

03REAL DURATIONSFROM ACTUAL PROJECTS

Here is how long real
projects actually took.

ScopeActual durationReference projects
MES · PLM build6–13 months — depending on scopeRPS PLM 6 months · Topseal MES upgrade 8 months · Intops PLM 9 months · NKID MES 13 months
Manufacturing-AI specialized projectAbout 9 monthsJustem 2026.07–2027.03, and others
AI Autonomous Factory project24 monthsSpeefox 2025.06–2027.06 · about 24 months · Chexcar 2026.06–2028.05
Your own timeline is presented in the diagnosis once scope is fixed — every duration above is an actual project record.
04GOV-FUNDED PATHS8 PROGRAM TYPES EXPERIENCED

You can start with
government funding.

We have delivered under eight types of the national Smart Factory program — AI Autonomous Factory · Manufacturing-AI specialized · large-SME win-win (Samsung Electronics) · government standard · expert · inter-ministry · local-government · Smart AS. We design the lowest-out-of-pocket path to start with, together, during the diagnosis.

GOV-1Autonomous Factory build program (MSS · 2 sites delivered)GOV-2Manufacturing-AI specialized (6 projects)GOV-3Large-SME win-win — Samsung ElectronicsGOV-4Government standardGOV-5ExpertGOV-6Inter-ministry — food GMPGOV-7Local governmentGOV-8Smart AS

The exact quote comes from the diagnosis.

Once we confirm the three axes together, we give you a quote with its calculation basis.