VEXPLOR
VEXPLOR VISION SIM

A machine worth hundreds of millions —decided from a quotation alone?

Where a hundred-million-won decision rested on a quotation and experience, we put a result you have actually run. Compare scenarios side by side, and send only settings that passed.

DES + ABS HYBRID · ACCURACY 85% SPEEFOX REFERENCE · ZERO COST OF FAILURE
The same line run twice, one setting changed, placed side by side
FIG — The same line run twice, one setting changed, placed side by sideLeft detour / right straight
01WHO & WHYVISION SIM

A large capital decision
rests on a quote and a hunch.

Dashboards tell you what happened last month. The question you actually need answered is a different one — what happens if we change this.

  • Companies weighing equipment expansion or replacement
  • Companies about to reconfigure lines or material flow
  • Executives who need grounds for an investment
02FUNCTIONSCapability
#CapabilityWhat it does
01Hybrid simulationDiscrete-event and agent-based simulation combined and GPU-accelerated, running the whole line virtually.
02Six what-if scenariosEquipment failure, material delay, rush orders, bottlenecks and more, run in parallel and compared side by side.
03Monte Carlo riskVariability is quantified through repeated runs, giving worst case, best case and a probability range.
04Virtual commissioningEquipment introduction and policy changes are validated virtually, then applied to the real PLC with a rollback path.
05Accuracy managementSimulation output is compared with real line data. Accuracy of 85% was confirmed at SpeeFox on a composite of time, resource and output, with ML correcting parameters automatically.
06KPI comparisonUtilisation, lead time and output are compared across scenarios.
03FLOWInput → Output
TWIN MODEL + PROCESS DATA DES + ABS SIMULATION SCENARIO COMPARISON VALIDATED SETTINGS TO PLC FAILING VIRTUALLY COSTS NOTHING — ONLY SETTINGS THAT PASS GO TO THE FLOOR
VERIFIED85%Simulation accuracy — SpeeFox reference, composite measure
SPEC6Standard what-if scenarios compared in parallel
SPECZeroCost of failing virtually
The 85% figure comes from the autonomous factory programme at SpeeFox; certified testing is scheduled for 2027. Speed-up multiples are not quoted without the conditions and the site they were measured on.

Run it before you change it.

Confirm the effect of expansion, replacement or reconfiguration in numbers first.

Vision familyRequest an assessment